If you deliver or implement a utility efficiency program, your next big decisions (which offerings to push, what to propose in the next bid, how to price it) rest on numbers you already report every month: projects completed, measures installed, kilowatt-hours claimed. Those are gross numbers. In most jurisdictions, the number that decides how much of that work counts is one most small energy services firms never measure themselves: how many of those customers would have done the project anyway.
That question usually gets answered for you, by someone else, after the program year closes. It is worth answering yourself first.
Gross savings get counted. In most places, net savings get reviewed.
Evaluators separate gross savings (what was installed) from net savings (what the program caused). The gap between them comes mostly from free ridership: participants who would have taken the same action at the same time without the incentive. Spillover runs the other way, counting efficiency actions the program influenced but did not pay for. How much that matters depends on where you work. Some jurisdictions measure program performance on gross savings. Most use net, so the ratio of net to gross ends up in the utility's goals and cost-effectiveness case, and that case is what regulators examine in a rate case or program review.
Two things about how that number is produced matter to an implementer. First, it is mostly survey-based. A 2020 meta-analysis in the journal Energy Efficiency reviewed 120 evaluation studies from 2006 to 2018 and found that most free-ridership and spillover estimates came from survey results. Second, methods are not uniform. The Uniform Methods Project chapter on estimating net savings (NREL, 2017) describes common practices rather than prescribing one, and notes that the definition of net savings is still unsettled in the evaluation community.
So where net savings apply, the figure that shapes how your work is valued comes from a participant survey you did not design, using a method that varies by jurisdiction, reported after your program year is over. If it surprises you, the surprise arrives at the worst time: during contract renewal or the next bid.
A hypothetical example
Consider a regional HVAC and controls firm delivering a utility small-business program with two offerings. The first is a rebated smart thermostat, sold mostly to customers who called in because their old thermostat or system had failed. The second is a rooftop unit tune-up, found mostly through the firm's own outreach to businesses that had not asked for anything.
By the firm's monthly reports, the thermostat is the success story: most of the projects and a steady flow of claimed savings. The firm's draft proposal for the next cycle asks for more thermostat volume.
Then the evaluator's participant survey comes back. Say most thermostat customers report that they had already decided to replace the unit and would have bought a similar model at the same time without the rebate, while most tune-up customers report they would not have scheduled the work at all. The offering the firm was scaling counted for the least. The one it treated as a side line did most of the work the program was paying for.
None of that required an evaluator to discover. It required asking the same customers a few careful questions while the firm still had their attention.
Your reports count what was installed. Where savings are judged on net, program influence decides how much of that work counts.
Three questions at close-out
You can get an early read on program influence by adding three questions to the close-out process, asked of every participant:
Before you heard about the incentive, had you already planned this project? (Yes, definitely / Considering it / No)
Without the incentive, would you have done it at the same time, later, or not at all?
Without the incentive, would you have chosen the same efficiency level, a lower one, or the standard option?
Then record how the customer found you (inbound call, contractor referral, your outreach, utility marketing) and attach the answers to the project record. Look at the results by offering and by channel, not as one firm-wide average. The firm-wide number hides exactly the difference the example above turned on.
Sample size is less of a barrier than it looks. With 120 completed close-out surveys for one offering, a result near 50% carries a margin of error of about ±9 points at 95% confidence. That is enough to tell an offering where 60% of customers would have acted anyway from one where 20% would have. It is not enough to tell 45% from 50%, and it does not need to be.
Where the research craft comes in
This only works if the questions are asked well. Three practices matter most.
Ask about specific behavior, not influence.
"Did the rebate influence your decision?" invites a polite yes. Questions about timing and efficiency level are harder to answer just to please the person asking, and they map onto how evaluators usually score free ridership.
Separate the asker from the seller.
A customer will not tell the technician who just finished the job that the rebate made no difference. Send the questions by email or text after close-out, or have someone outside the sales relationship ask.
Treat it as an early warning, not a replacement.
Your evaluator will use its own instrument, scoring rules, and consistency checks, and its result is the one that counts. Your read tells you which way the number is likely to move and which offerings to look at, so you walk into the review with evidence instead of hope.
I have worked on the method side of this question. At Cadmus, I worked on a study that tested discrete choice modeling against other methods for estimating how much rebates versus financing contributed to customers' decisions. The main lesson was that the method changes the answer, which is why it pays to understand your own customers before someone else's method speaks for them. At Austin Energy, our customer surveys became far more useful once they were joined to program participation and billing records. The same join works at a small firm's scale: a short close-out survey tied to the project file.
When this is not worth the effort
If your jurisdiction measures performance on gross savings, or your program uses a deemed net-to-gross ratio that regulators have fixed for the contract period, your own read will not change your reported savings. It is still useful for bid strategy and for deciding where to put outreach effort, but it is less urgent.
If an offering closes fewer than about 50 projects a year, a survey will not give you a stable number. Ten to fifteen short phone conversations with recent participants will tell you more about why they acted than a percentage would.
And if you are not going to change anything based on the answer (which offerings you push, how you find customers, what you propose), skip it until you are.
Before the next bid
Where savings are judged on net, program influence is the number that decides how your work is valued, and most firms see it last. Measuring it yourself costs a few questions per project and a quarterly look at the results.
Sources
Uniform Methods Project, Chapter 21: Estimating Net Savings: Common Practices. National Renewable Energy Laboratory, 2017. osti.gov/biblio/1408086
Meta-analysis of free ridership and spillover estimates across 120 EM&V studies, 2006–2018. Energy Efficiency, 2020. link.springer.com